Projects

Driving change in all our projects through competence, capacity and commitment.

Our Projects

We provide multidisciplinary fit-for-purpose design, engineering, EPCM, rehabilitation and ESG capabilities across the full project life to help our clients realise their development vision. in the Resources, Energy and Industrial sectors. This includes mitigating risk, improving safety, minimising operational disruptions, optimising asset performance, connecting to infrastructure and freight networks, navigating through statutory approvals, enhancing their social license to operate, making projects bankable and increasing value for all stakeholders.

  • API Hub to Mulga Downs PFS Cost Study

    API Hub to Mulga Downs PFS Cost Study

    BG&E Resources is currently undertaking a PFS for Roy Hill for a heavy haul rail transportation option linking the API Hub to the proposed Mulga Downs mine.

    Read More

  • RGP Rail Bridge Detailed Waterways

    RGP Rail Bridge Detailed Waterways

    BG&E Resources was commissioned to conduct a detailed waterways analysis of 12 rail bridges as part of BHPBIO’s RGP5 rail upgrade between Newman and Port Hedland in the Pilbara region of Western Australia.

    Read More

  • Syama Roaster Shutdown

    Syama Roaster Shutdown

    BG&E Resources assisted with the shutdown works where Resolute require structural engineering services for rigging design, development of materials movement plans and laydown areas assessment

    Read More

  • MAC Minewater Tank Duplication

    MAC Minewater Tank Duplication

    The key objective of this tank duplication project was to provide duplication of the current storage and pumping system to mitigate the risk to the BHP MAC plant of being reliant on a single system regarding the plant and fire water supply.

    Read More

  • BHP Jimblebar NPI Buildings

    BHP Jimblebar NPI Buildings

    Mine site infrastructure project consisting of heavy vehicle workshop, ore-handling plant workshop, HV & LV wash-down, sample-prep laboratory and minor buildings.

    Read More

  • Mount Morgans Primary Crusher Vibration Assesment

    Mount Morgans Primary Crusher Vibration Assesment

    Shortly after commissioning of the Mt Morgan’s Gold Mine, several failures of structural elements were identified at the crushing facility.

    Read More

  • MESA A Mine Site – MEM Workshop

    MESA A Mine Site – MEM Workshop

    This project included an open sided workshop to service large mining trucks and located in known cyclonic areas.

    Read More

  • GNH Solomon Overpass

    GNH Solomon Overpass

    BG&E Resources was engaged to provide PFS design input and technical guidance on the optioneering works required to build 5.3km of new haul road and 6km of public access road.

    Read More

  • Nammuldi BWT Non Process Infrastructure

    Nammuldi BWT Non Process Infrastructure

    Three elements make up the Inflow, Primary Crushing Stations, Overland Conveying and Coarse Ore Stockpiling. The Process Plant SOW consists of both a dry and wet circuit, beginning at the COS vaults and ending at either the stockyard or tailings facilities.

    Read More

  • Roy Hill Mine Services –  Heavy Vehicle Workshop Structures

    Roy Hill Mine Services – Heavy Vehicle Workshop Structures

    The Heavy Vehicle and Boiler Maker workshops have been designed for the service and maintenance of the Roy Hill mine fleet vehicles, which includes the world’s largest haul truck capacity fleet.

    Read More

Client : Roy Hill
20220914 143804
Our team completed the detailed design of the ROM 4 Crushing Station 5 Facility at the Roy Hill Iron Ore Read more
Client : Rio Tinto
Conveyor Belt Moving Iron Ore
A global mining giant engaged us to undertake a decarbonisation study to demonstrate reduced operating costs, reduced risk and reduced Read more
Client : Rio Tinto
Wqr
BG&E Resources recently completed on-site construction support services for Rio Tinto Iron Ore at the White Quartz Road Realignment situated Read more
Client : Rio Tinto
Dji 0598
BG&E Resources developed an award-winning innovative solution that incorporated offering up a large concrete and steel isolation frame to the Read more
Client : Roy Hill
5000 036
We have been instrumental in the expansion of Roy Hill’s Stanley Point 3 – part of the Port of Headland Read more
Client : Roy Hill
Rom3
To maintain required production levels, Roy Hill required a new crushing facility 6km from the existing infrastructure. Read more
Client : Central Systems for FMG
Img 9493
We have worked collaboratively with Central Systems and Fortescue to deliver concrete and steel plate arch structures at Cloudbreak. Read more
Client : Roy Hill
Global Index Study
Prior to joining BG&E Resources, a member of our ESG Advisory team served as Project Director for this study, which Read more
Client : Roy Hill
Ffi Hazelmere Hydrogen Powered Haul Truck3
We are providing Early Engineering works to enable the electrification of Fortescue’s mining equipment and assets across its Australian iron Read more
Processing...
Thank you! Your subscription has been confirmed. You'll hear from us soon.
Subscribe to our News & Insights
ErrorHere