This project included an open sided workshop to service large mining trucks and located in known cyclonic areas. It featured: 550mm thick slab for jacking procedure 1200 WB portals 18m high 2 x 25 tonne overhead travelling cranes Other buildings included a welding bay, ammonium nitrate store, warehouse and wash-down areas