BG&E Resources is currently undertaking a PFS for Roy Hill for a heavy haul rail transportation option linking the API Hub to the proposed Mulga Downs mine. The study is inclusive of a +/-30% cost estimate. Rail alignment options considered include both non-banking and banking due to challenging terrain. The alignment includes several grade separated structures at interfaces with other railways and existing roads.