Location
Port Hedland, Western Australia
Client
Fortescue
Contact
The MOF was required to accommodate heavy lift vessels up to 165m LOA offloading modules up to 40 metres in length.
The design consisted of a rock causeway approach to a piled combi wall with tiebacks. BG&E Resources worked closely with the marine contractor to optimise the design to fast-track the project.
By reviewing the clients original concept design for this facility, BG&E Resources was able to reduce the costs of the facility by approximately $20 million due to removing the requirement for a large ballasted barge.