Projects Grid

Client : Roy Hill
Pilbara Ports has engaged us to deliver various detailed design and concept design works for the Lumsden Point development. Read more
Client : Roy Hill
We were engaged to prepare an execution plan for the Bankable Feasibility Study (BFS). Read more
Client : Roy Hill
We supported Rio Tinto through multiple project phases for the overland conveyor (OC) belting replacements at Western Turner Syncline (WTS). Read more
Client : Roy Hill
Large Water Tanks at Fortescue's Solomon Kings Valley Mine
Fortescue contracted us to deliver an options assessment for the replacement of the TK202 tanks at its Solomon operations. Read more
Client : Roy Hill
Pilbara Minerals sought our assistance to develop the detailed concrete, civil and EIC design of a new onsite explosives facility. Read more
Client : Roy Hill
We are reviewing the maintenance and operations requirements to prepare a scoping matrix for Pilbara Minerals’ P680 Expansion Project. Read more
Client : Roy Hill
BG&E Resources is completing a pre-feasibility study to power a Western Australian gold mine with 60%+ renewable energy generation. Read more
Client : Roy Hill
We have developed the detailed design for remediation solution for the reclaimer rails and foundation to extend the life of Read more
Client : Roy Hill
We have identified optimal solutions for magnetite handling within the Ridley Development Envelope at Port Hedland, and into the Stanley Read more
Processing...
Thank you! Your subscription has been confirmed. You'll hear from us soon.
Subscribe to our News & Insights
ErrorHere