Projects

Driving change in all our projects through competence, capacity and commitment.

Our Projects

We provide multidisciplinary fit-for-purpose design, engineering, EPCM, rehabilitation and ESG capabilities across the full project life to help our clients realise their development vision. in the Resources, Energy and Industrial sectors. This includes mitigating risk, improving safety, minimising operational disruptions, optimising asset performance, connecting to infrastructure and freight networks, navigating through statutory approvals, enhancing their social license to operate, making projects bankable and increasing value for all stakeholders.

  • Lumsden Point

    Lumsden Point

    To support Fortescue’s Iron Bridge Project, we have provided the Concept and Detailed Design for a temporary Materials Offloading Facility (MOF) at Lumsden Point.

    Read More

  • Onslow Iron Project

    Onslow Iron Project

    BG&E Resources was engaged to develop a concept design for the port facilities of MRL’s 30Mtpa Onslow Iron Project.

    Read More

  • Hydrogen Refuelling Station

    Hydrogen Refuelling Station

    We have a played a key role in Fortescue’s push to use hydrogen to decarbonise its operations.

    Read More

  • Hydrate Storage Shed & Study

    Hydrate Storage Shed & Study

    We have investigated options to meet short-term storage capacity storage and mitigate production impacts at Alcoa’s Pinjarra Aluminium Refinery.

    Read More

  • CB Process Water Tank

    CB Process Water Tank

    BG&E Resources was requested to provide a proposal for the design of a new 1,716m³ capacity steel tank to store process water. The new tank replaced the existing bolted panel tank of diameter 15.75m and height 8.81m.

    Read More

  • Eldo Plateau Haul Road PFS Waterways

    Eldo Plateau Haul Road PFS Waterways

    Rio Tinto Gove Operations require a haul road and a public access road to be constructed by 2022 to safeguard the mines throughput target of 13.0 Mtpa.

    Read More

  • Gudai Darri SMP Transportation Steel

    Gudai Darri SMP Transportation Steel

    BG&E Resources was engaged to undertake lifting, transportation and temporary works design of the modular steel structures.

    Read More

  • Parkes Terminal Facility

    Parkes Terminal Facility

    As lead design consultant for the brand-new freight facility with container storage, rail sidings, heavy vehicle access roads and direct interface to the first stage of ARTC’s Inland Rail.

    Read More

  • Roy Hill Ultrafines Stage 2

    Roy Hill Ultrafines Stage 2

    The Roy Hill Ultrafines Stage 2 Project forms part of Roy Hill’s project pipeline to identify recovery improvement and expansion projects to be able to consistently achieve the approved export capacity of 60Mtpa.

    Read More

  • API Hub to Mulga Downs PFS Cost Study

    API Hub to Mulga Downs PFS Cost Study

    BG&E Resources is currently undertaking a PFS for Roy Hill for a heavy haul rail transportation option linking the API Hub to the proposed Mulga Downs mine.

    Read More

Client : Rio Tinto
Eldo Plateau Haul Road Pfs Waterways
Rio Tinto Gove Operations require a haul road and a public access road to be constructed by 2022 to safeguard Read more
Client : Rio Tinto
Guddai Darri Project (6)
BG&E Resources was engaged to undertake lifting, transportation and temporary works design of the modular steel structures. Read more
Client : Coleman Rail / Pacific Rail
Parkes Terminal Facility
As lead design consultant for the brand-new freight facility with container storage, rail sidings, heavy vehicle access roads and direct Read more
Client : Roy Hill
Roy Hill Whims Ultrafines (4)
The Roy Hill Ultrafines Stage 2 Project forms part of Roy Hill’s project pipeline to identify recovery improvement and expansion Read more
Client : Roy Hill
Rtio Rail
BG&E Resources is currently undertaking a PFS for Roy Hill for a heavy haul rail transportation option linking the API Read more
Client : BHP Billiton
Rgp Rail Bridge Detailed Waterways
BG&E Resources was commissioned to conduct a detailed waterways analysis of 12 rail bridges as part of BHPBIO’s RGP5 rail Read more
Client : Resolute Mining
Heroplaceholder 1680x600
BG&E Resources assisted with the shutdown works where Resolute require structural engineering services for rigging design, development of materials movement Read more
Client : BHP Billiton
Bhp Mac Tank Duplication
The key objective of this tank duplication project was to provide duplication of the current storage and pumping system to Read more
Client : Kerman Contracting
3578 2013 Jimblebar Hub Industrial Buildings And Facilities Aerial Bhp Lr
Mine site infrastructure project consisting of heavy vehicle workshop, ore-handling plant workshop, HV & LV wash-down, sample-prep laboratory and minor Read more
Processing...
Thank you! Your subscription has been confirmed. You'll hear from us soon.
Subscribe to our News & Insights
ErrorHere