Projects

Driving change in all our projects through competence, capacity and commitment.

Our Projects

We provide multidisciplinary fit-for-purpose design, engineering, EPCM, rehabilitation and ESG capabilities across the full project life to help our clients realise their development vision. in the Resources, Energy and Industrial sectors. This includes mitigating risk, improving safety, minimising operational disruptions, optimising asset performance, connecting to infrastructure and freight networks, navigating through statutory approvals, enhancing their social license to operate, making projects bankable and increasing value for all stakeholders.

  • Global Cities Index/Study

    Global Cities Index/Study

    Prior to joining BG&E Resources, a member of our ESG Advisory team served as Project Director for this study, which included developing the methodology and coordinating more than 100 subject matter specialists who lived and worked in the respective cities.

    Read More

  • Decarbonising Fortescue’s Infrastructure – Early Engineering

    Decarbonising Fortescue’s Infrastructure – Early Engineering

    We are providing Early Engineering works to enable the electrification of Fortescue’s mining equipment and assets across its Australian iron ore operations.

    Read More

  • Modern Slavery Industry Project

    Modern Slavery Industry Project

    Prior to joining BG&E Resources, a member of our ESG Advisory team served as Project Director of the Modern Slavery Industry Project, which included canvassing some 300 stakeholders from the Resources sector in Australia, Papua New Guinea and Africa, about the key issues that underpin modern slavery.

    Read More

  • Green Ammonia Project

    Green Ammonia Project

    BG&E Resources is providing stakeholder consultation and cultural heritage management capabilities (among others), for the proposed 750,000-tonne per annum green ammonia plant.

    Read More

  • ESG Project Experience

    ESG Project Experience

    Members of our ESG team have amassed considerable project experience, providing services including: Environmental Management, Compliance & Approvals, Sustainability Reporting, Ethical Procurement & Supply Chain, Indigenous Employment & Engagement.

    Read More

  • White Quartz Road Realignment

    White Quartz Road Realignment

    We completed on-site construction support services for the White Quartz Road Realignment.

    Read More

  • Mardie Salt & Potash

    Mardie Salt & Potash

    We have supported BCI Minerals Limited in its development of the Mardie Salt and Potash Project, a sustainable opportunity to develop a large-scale, multi-generational solar evaporation operation on the Pilbara coast of Western Australia (WA).

    Read More

  • Lumsden Point

    Lumsden Point

    To support Fortescue’s Iron Bridge Project, we have provided the Concept and Detailed Design for a temporary Materials Offloading Facility (MOF) at Lumsden Point.

    Read More

  • Onslow Iron Project

    Onslow Iron Project

    BG&E Resources was engaged to develop a concept design for the port facilities of MRL’s 30Mtpa Onslow Iron Project.

    Read More

  • Hydrogen Refuelling Station

    Hydrogen Refuelling Station

    We have a played a key role in Fortescue’s push to use hydrogen to decarbonise its operations.

    Read More

Client : Roy Hill
Roy Hill Whims Ultrafines (4)
The Roy Hill Ultrafines Stage 2 Project forms part of Roy Hill’s project pipeline to identify recovery improvement and expansion Read more
Client : Roy Hill
Rtio Rail
BG&E Resources is currently undertaking a PFS for Roy Hill for a heavy haul rail transportation option linking the API Read more
Client : BHP Billiton
Rgp Rail Bridge Detailed Waterways
BG&E Resources was commissioned to conduct a detailed waterways analysis of 12 rail bridges as part of BHPBIO’s RGP5 rail Read more
Client : Resolute Mining
Heroplaceholder 1680x600
BG&E Resources assisted with the shutdown works where Resolute require structural engineering services for rigging design, development of materials movement Read more
Client : BHP Billiton
Bhp Mac Tank Duplication
The key objective of this tank duplication project was to provide duplication of the current storage and pumping system to Read more
Client : Kerman Contracting
3578 2013 Jimblebar Hub Industrial Buildings And Facilities Aerial Bhp Lr
Mine site infrastructure project consisting of heavy vehicle workshop, ore-handling plant workshop, HV & LV wash-down, sample-prep laboratory and minor Read more
Client : Dacian Gold
Dcim102mediadji 0052.jpg
Shortly after commissioning of the Mt Morgan’s Gold Mine, several failures of structural elements were identified at the crushing facility. Read more
Client : Formstruct
Formtstruct Projects Project Meme 2 Dome Temp Workshop
This project included an open sided workshop to service large mining trucks and located in known cyclonic areas. Read more
Client : FMG
Great North Highway Fortescue Road Over Rail Bridge 2400x1200
BG&E Resources was engaged to provide PFS design input and technical guidance on the optioneering works required to build 5.3km Read more
Processing...
Thank you! Your subscription has been confirmed. You'll hear from us soon.
Subscribe to our News & Insights
ErrorHere