Projects

Driving change in all our projects through competence, capacity and commitment.

Our Projects

We provide multidisciplinary fit-for-purpose design, engineering, EPCM, rehabilitation and ESG capabilities across the full project life to help our clients realise their development vision. in the Resources, Energy and Industrial sectors. This includes mitigating risk, improving safety, minimising operational disruptions, optimising asset performance, connecting to infrastructure and freight networks, navigating through statutory approvals, enhancing their social license to operate, making projects bankable and increasing value for all stakeholders.

  • Hydrate Storage Shed & Study

    Hydrate Storage Shed & Study

    We have investigated options to meet short-term storage capacity storage and mitigate production impacts at Alcoa’s Pinjarra Aluminium Refinery.

    Read More

  • CB Process Water Tank

    CB Process Water Tank

    BG&E Resources was requested to provide a proposal for the design of a new 1,716m³ capacity steel tank to store process water. The new tank replaced the existing bolted panel tank of diameter 15.75m and height 8.81m.

    Read More

  • Eldo Plateau Haul Road PFS Waterways

    Eldo Plateau Haul Road PFS Waterways

    Rio Tinto Gove Operations require a haul road and a public access road to be constructed by 2022 to safeguard the mines throughput target of 13.0 Mtpa.

    Read More

  • Gudai Darri SMP Transportation Steel

    Gudai Darri SMP Transportation Steel

    BG&E Resources was engaged to undertake lifting, transportation and temporary works design of the modular steel structures.

    Read More

  • Parkes Terminal Facility

    Parkes Terminal Facility

    As lead design consultant for the brand-new freight facility with container storage, rail sidings, heavy vehicle access roads and direct interface to the first stage of ARTC’s Inland Rail.

    Read More

  • Roy Hill Ultrafines Stage 2

    Roy Hill Ultrafines Stage 2

    The Roy Hill Ultrafines Stage 2 Project forms part of Roy Hill’s project pipeline to identify recovery improvement and expansion projects to be able to consistently achieve the approved export capacity of 60Mtpa.

    Read More

  • API Hub to Mulga Downs PFS Cost Study

    API Hub to Mulga Downs PFS Cost Study

    BG&E Resources is currently undertaking a PFS for Roy Hill for a heavy haul rail transportation option linking the API Hub to the proposed Mulga Downs mine.

    Read More

  • RGP Rail Bridge Detailed Waterways

    RGP Rail Bridge Detailed Waterways

    BG&E Resources was commissioned to conduct a detailed waterways analysis of 12 rail bridges as part of BHPBIO’s RGP5 rail upgrade between Newman and Port Hedland in the Pilbara region of Western Australia.

    Read More

  • Syama Roaster Shutdown

    Syama Roaster Shutdown

    BG&E Resources assisted with the shutdown works where Resolute require structural engineering services for rigging design, development of materials movement plans and laydown areas assessment

    Read More

  • MAC Minewater Tank Duplication

    MAC Minewater Tank Duplication

    The key objective of this tank duplication project was to provide duplication of the current storage and pumping system to mitigate the risk to the BHP MAC plant of being reliant on a single system regarding the plant and fire water supply.

    Read More

Client : Roy Hill
Cropped Cropped Timeline Main
BGER were engaged to provide geotechnical engineering services to inform a Definitive Feasibility Study and support a dredging characterisation package Read more
Client : Roy Hill
Lake Keepit
BGER QLD was engaged to develop an alternative solution to supply water from Lake Keepit to Whitehaven Coal’s Gunnedah Basin Read more
Client : Roy Hill
Cracow Gold Mine Aeris Resources
BGER QLD is currently undertaking several upgrades and de-bottlenecking exercises at the Cracow Gold Operation. Read more
Client : Roy Hill
Rio Tinto Gove Operations 0419
We worked closely with Rio Tinto to develop a new wastewater treatment train design for its Gove site. Read more
Client : Roy Hill
Cv25 Ladder Train Load Out Paraburdoo
Rio Tinto engaged us to undertake a Pre-Feasibility Study for the overhaul of the Train Load Out facility. Read more
Client : Roy Hill
Pilgangoora Plant
Pilbara Minerals sought our assistance to develop the detailed concrete, civil and EIC design of a new onsite explosives facility. Read more
Client : Roy Hill
Lumsden Artist Impression 2
Pilbara Ports has engaged us to deliver various detailed design and concept design works for the Lumsden Point development. Read more
Client : Roy Hill
Conveyor,belt,moving,iron,ore
We were engaged to prepare an execution plan for the Bankable Feasibility Study (BFS). Read more
Client : Roy Hill
Drone Overview
We supported Rio Tinto through multiple project phases for the overland conveyor (OC) belting replacements at Western Turner Syncline (WTS). Read more
Processing...
Thank you! Your subscription has been confirmed. You'll hear from us soon.
Subscribe to our News & Insights
ErrorHere