Projects

Driving change in all our projects through competence, capacity and commitment.

Our Projects

We provide engineering design of Process Plants and Infrastructure Facilities where we have an in-depth understanding of the project lifecycle by assisting our Clients through all stages of the projects delivery from conceptual design and feasibility studies to detail design, construction support and commissioning. Our success is founded on our ability to provide innovative and cost effective outcomes for our Clients.

  • Gudai Darri SMP Transportation Steel

    Gudai Darri SMP Transportation Steel

    BGER were engaged to undertake lifting, transportation and temporary works design of the modular steel structures. BGER worked closely with Laing O’Rourke’s transportation contractor NMT Global to optimise our design solutions while minimising risks.

    Read More

  • Parkes Terminal Facility

    Parkes Terminal Facility

    As lead design consultant for the brand-new freight facility with container storage, rail sidings, heavy vehicle access roads and direct interface to the first stage of ARTC’s Inland Rail.

    Read More

  • Roy Hill Ultrafines Stage 2

    Roy Hill Ultrafines Stage 2

    The Roy Hill Ultrafines Stage 2 Project forms part of Roy Hill’s project pipeline to identify recovery improvement and expansion projects to be able to consistently achieve the approved export capacity of 60Mtpa.

    Read More

  • API Hub to Mulga Downs PFS Cost Study

    API Hub to Mulga Downs PFS Cost Study

    BG&E Resources is currently undertaking a PFS for Roy Hill for a heavy haul rail transportation option linking the API Hub to the proposed Mulga Downs mine.

    Read More

  • RGP Rail Bridge Detailed Waterways

    RGP Rail Bridge Detailed Waterways

    BGER was commissioned to conduct a detailed waterways analysis of 12 rail bridges as part of BHPBIO’s RGP5 rail upgrade between Newman and Port Hedland in the Pilbara region of Western Australia.

    Read More

  • Syama Roaster Shutdown

    Syama Roaster Shutdown

    BGER are assisting with the shutdown works where Resolute require structural engineering services for rigging design, development of materials movement plans and laydown areas assessment

    Read More

  • MAC Minewater Tank Duplication

    MAC Minewater Tank Duplication

    The key objective of this tank duplication project was to provide duplication of the current storage and pumping system to mitigate the risk to the BHP MAC plant of being reliant on a single system regarding the plant and fire water supply.

    Read More

  • BHP Jimblebar NPI Buildings

    BHP Jimblebar NPI Buildings

    Mine site infrastructure project consisting of heavy vehicle workshop, ore-handling plant workshop, HV & LV wash-down, sample-prep laboratory and minor buildings.

    Read More

  • Mount Morgans Primary Crusher Vibration Assesment

    Mount Morgans Primary Crusher Vibration Assesment

    Shortly after commissioning of the Mt Morgan’s Gold Mine, several failures of structural elements were identified at the crushing facility.

    Read More

  • MESA A Mine Site – MEM Workshop

    MESA A Mine Site – MEM Workshop

    This project included an open sided workshop to service large mining trucks and located in known cyclonic areas.

    Read More

Client : Roy Hill
With phase 1 plant design consisting of a 3.5Mtpa pellet plant and a 2Mtpa HBI plant and considers a range Read more
Client : Roy Hill
The $350 million infrastructure project will enable MWPA to facilitate diverse and emerging trade opportunities and significantly increase throughput capacity Read more
Client : Roy Hill
Our NetZero in Design approach will be integrated throughout the project life cycle to ensure our client achieves their targets Read more
Client : K+S Salt Australia
Design of a new solar salt production and export facility within the west Pilbara region of Western Australia. Read more
Client : Roy Hill
The ROM 4 facility has an upgraded annual capacity of 34.1mtpa and has been designed to cater for larger haul Read more
Client : Rio Tinto
The tertiary cyclone project aim to improve plant recovery, through improvement of fines production, reducing per ton operation costs and Read more
Client : Rio Tinto
BG&E Resources recently completed on-site construction support services for Rio Tinto Iron Ore at the White Quartz Road Realignment situated Read more
Client : Rio Tinto
BG&E Resources developed an award-winning innovative solution that incorporated offering up a large concrete and steel isolation frame to the Read more
Client : Roy Hill
This study incorporated sufficient engineering definition (15%) to support a Class 4 cost estimate for a base caseintegrated stockyard and Read more