Projects

Driving change in all our projects through competence, capacity and commitment.

Our Projects

We provide engineering design of Process Plants and Infrastructure Facilities where we have an in-depth understanding of the project lifecycle by assisting our Clients through all stages of the projects delivery from conceptual design and feasibility studies to detail design, construction support and commissioning. Our success is founded on our ability to provide innovative and cost effective outcomes for our Clients.

  • Eldo Plateau Haul Road PFS Waterways

    Eldo Plateau Haul Road PFS Waterways

    Rio Tinto Gove Operations require a haul road and a public access road to be constructed by 2022 to safeguard the mines throughput target of 13.0 Mtpa.

    Read More

  • Gudai Darri SMP Transportation Steel

    Gudai Darri SMP Transportation Steel

    BGER were engaged to undertake lifting, transportation and temporary works design of the modular steel structures. BGER worked closely with Laing O’Rourke’s transportation contractor NMT Global to optimise our design solutions while minimising risks.

    Read More

  • Parkes Terminal Facility

    Parkes Terminal Facility

    As lead design consultant for the brand-new freight facility with container storage, rail sidings, heavy vehicle access roads and direct interface to the first stage of ARTC’s Inland Rail.

    Read More

  • Roy Hill Ultrafines Stage 2

    Roy Hill Ultrafines Stage 2

    The Roy Hill Ultrafines Stage 2 Project forms part of Roy Hill’s project pipeline to identify recovery improvement and expansion projects to be able to consistently achieve the approved export capacity of 60Mtpa.

    Read More

  • Whyalla Iron Ore Export

    Whyalla Iron Ore Export

    Materials handling and storage facility located at the existing port in Whyalla, South Australia. The project included a 14m deep train-dump vault and inclined conveyor tunnel. The first transfer tower houses a shuttle conveyor to feed 3 separate conveyor lines. Features: Main storage sheds 170m x 72m x 26m high. Clear span trusses support in-loading ridge conveyor. Transfer towers, conveyor and trestle design.

    Read More

  • API Hub to Mulga Downs PFS Cost Study

    API Hub to Mulga Downs PFS Cost Study

    BG&E Resources is currently undertaking a PFS for Roy Hill for a heavy haul rail transportation option linking the API Hub to the proposed Mulga Downs mine.

    Read More

  • RGP Rail Bridge Detailed Waterways

    RGP Rail Bridge Detailed Waterways

    BGER was commissioned to conduct a detailed waterways analysis of 12 rail bridges as part of BHPBIO’s RGP5 rail upgrade between Newman and Port Hedland in the Pilbara region of Western Australia.

    Read More

  • Syama Roaster Shutdown

    Syama Roaster Shutdown

    BGER are assisting with the shutdown works where Resolute require structural engineering services for rigging design, development of materials movement plans and laydown areas assessment

    Read More

  • MAC Minewater Tank Duplication

    MAC Minewater Tank Duplication

    The key objective of this tank duplication project was to provide duplication of the current storage and pumping system to mitigate the risk to the BHP MAC plant of being reliant on a single system regarding the plant and fire water supply.

    Read More

  • FMG Solomon Stockyard

    FMG Solomon Stockyard

    Our team was responsible for: Design and documentation of the overland conveyor structure including foundations; Responsible for the design and documentation of all the take up and transfer structures;

    Read More

Client : BCI Minerals
A new facility comprising of seawater intake pump stations, seawater salt evaporation ponds and salt crystallisers with a dedicated new Read more
Client : FMG
Concept and Detailed Design for a temporary Materials Offloading Facility (MOF) at Lumsden Point to support FMG’s Iron Bridge Project. Read more
Client : Mineral Resources (MRL)
BGER were engaged to develop a concept design for the port facilities of MRL’s 30Mtpa Onslow Iron Project. Read more
Client : K+S Salt Australia
Design of a new solar salt production and export facility within the west Pilbara region of Western Australia. Read more
Client : Fortescue Future Industries (FFI)
Provision of suitable infrastructure to integrate specialist vendor supplied equipment into a bus refuelling facility. Read more
Client : Roy Hill
Our NetZero in Design approach will be integrated throughout the project life cycle to ensure our client achieves their targets Read more
Client : Rio Tinto
White Quartz Road (WQR) is an existing access road located approximately 55km north-west of Tom Price in the Pilbara, Western Read more
Client : FMG
BGER was requested to provide a proposal for the design of a new 1,716m³ capacity steel tank to store process Read more
Client : KCGM
BGER was engaged to provide detailed design for the installation of an MMS Series 100 shear reactor on two leach Read more