BG&E Resources was engaged to provide detailed design for the existing Christmas Creek OPF trippers which has been experiencing material handling issues.
These issues were primarily chute blockages as a result of handling problematic material with high moisture and clay contents, being anticipated as an ongoing and increasing problem.
The Scope of Works included review and cross-verification of existing design drawings, update of 3D models in CAD format, undertake design reviews and develop and provision the detailed deliverables list.