Silvergrass NPI Facilities

Location

Hamersley Ranges, Pilbara, Western Australia

Client

Decmil

Contact

+61 8 6375 9100

info@bge-resources.com

BGER were commissioned by Decmil to conduct the civil and structural detailed design for the Separable Parts 1 and 2 of the Silvergrass Project iron ore deposits. BG&E’s design considered all Client operational requirements for access and traffic flow whilst maintaining designated ‘HV and ‘LV’ zones to minimize vehicle interaction. The design of the concrete floor slab in the heavy vehicle workshop increased the speed of construction, reduced the possibility of physical injury to steel fixers and allowed steel fixers to walk.