The project involved construction of a road receival hopper, a rail receival facility, an elevated overland in-loading conveyor system and a grain storage area comprising eight fat bottom 10,000 tonne capacity silos, nine 2,000 tonne capacity elevated cone bottom silos, bucket elevators and conveyors for materials handling, ship loading conveyor and batch weighing systems, weigh bridge and control buildings.