Location
Hamersley Ranges, Pilbara, Western Australia
Client
FMG
Contact
BGER was engaged to provide PFS design input and technical guidance on the optioneering works required to build 5.3km of new haul road and 6km of public access road. This also involved the optioneering of a high flow culvert crossing, including assessing shutdown periods and risk to mine throughput during different rain events. Assistance with resource loading, schedule development and cost estimating was also provided to forecast FS and execution timing and costs.