Location
Western Australia
Client
Fortescue Metals Group
Contact
Our team was responsible for: Design and documentation of the overland conveyor structure including foundations; Responsible for the design and documentation of all the take up and transfer structures; Verification of the lifting calculations as the majority of elements were pre-fabricated in Thailand and transported to site; Utilisation of BIM to coordinate designs with the mechanical & electrical consultants.