This project included an open sided workshop to service large mining trucks and located in known cyclonic areas.
A global mining giant engaged us to undertake a decarbonisation study to demonstrate reduced operating costs, reduced risk and reduced CO2e impacts of all scenarios.
BG&E Resources was engaged to undertake lifting, transportation and temporary works design of the modular steel structures.
BG&E Resources was commissioned to conduct a detailed waterways analysis of 12 rail bridges as part of BHPBIO’s RGP5 rail upgrade between Newman and Port Hedland in the Pilbara region of Western Australia.